Fleck 5600se manual download






















Model SE Downflow 5 Valve Installation and Start-up Procedures 1. Place the softener tank where you want to install the unit. NOTE: Be sure the tank is level and on a firm base. 2. During cold weather it is recommended that the installer warm . Turbine Meter Assembly 3/4 Electronic FL $ IN STOCK. Add To Cart. Printed in U.S.A. Page 7 MODEL SE Upflow Control Start-up Procedures (Cont’d.) A. Once the valve reaches Regen Step #1 let water run to drain for about 5 minutes.


Turbine Meter Assembly 3/4 Electronic FL $ IN STOCK. Add To Cart. NOTE: For electronic valves, please refer to the manual regeneration part of the timer operation section. If the valve came with a separate electronic timer service manual, refer to the timer operation. 12 1 label, display, SE 12A 1 label, display, SE, pictograph 13 1 cover, front panel, SE 14 1 button, conductive rubber 15 1 housing, circuit board 8 11 2 1 3 6 4 7 15 14 13 12 9 10 5.


Reverse Osmosis Water Treatment Systems sales@www.doorway.ru +1() +1 () www.doorway.ru Get a Quote Model Econominder® Service Manual. FLECK Service Manual • 3 by providing a path of least resistance for electric current. This appliance is equipped with a cord having an appliance-grounding conductor and a grounding plug. The plug must be plugged into an appropriate outlet that is installed and grounded in accordance with all local codes and ordinances. 2 • FLECK SXT Downflow Service Manual. INSTALLATION Water Pressure A minimum of 20 psi ( bar) of water pressure is required for the regeneration valve to.

0コメント

  • 1000 / 1000